Streambank Erosion Control Project Guidelines
Funding and Technical Support Is Available
Cost-share Rate: 50%
Maximum Payment: $10,000
Purpose:
To reduce soil erosion along waterways to improve surface water quality.
Eligible Projects
- Streambank stabilization including ditchbank seeding, spillway drop structures, culvert protection, and bioengineering techniques.
- Projects may be evaluated for eligibility on a case-by-case basis.
Project Details
- Design by professional engineers may be advisable on complex and/or large projects. The private sector is expected to fill these requirements. Supervision of construction is not mandatory, yet may be specified as required by program representatives on large and/or complex projects.
- Projects must have approval from appropriate agencies prior to construction. In addition, any work done on municipal drains also requires prior approval from the municipality.
- All collected water must be taken to a sufficient and legal outlet.
Eligible Costs
- Professional design
- Contractors' labour and materials.
Ineligible costs
- Machinery or equipment used by the applicant, family dependents or the applicant's business
- Replacement of existing retaining walls or other structures
- Gabion basket walls, steel retaining structures, concrete or solid retaining walls
- Permits
- Taxes
For more information, please call (905) 895-1281
Please note: Applications for funding may be made to the Lake Simcoe Region Conservation Authority at any time, however, funding is limited and available on a first come first serve basis.
Thank you, in advance, for submitting your completed Application Form and Project Profile to the Lake Simcoe Region Conservation Authority.
 |
Lake Simcoe Region Conservation Authority
120 Bayview Parkway, Box 282, Newmarket, Ontario L3Y 4X1
T: (905) 895-1281 F: (905) 853-5881 E-mail: info@lsrca.on.ca
|
|
Back to Top
|
 |