Cropland Erosion Control Structure Project Guidelines
Funding and Technical Support Is Available
Cost-share Rate: 50%
Maximum Payment: $10,000
Purpose:
To reduce soil erosion on farmland to protect surface water quality.
Eligible Projects
- Grass waterways
- Water and sediment control basins.
- Terraces
- Drop structures
Project Details
- The chance of obtaining funding for erosion control projects will be enhanced if conservation tillage practices are used on adjacent fields.
- Design by professional engineers may be advisable on complex and/or large projects. The private sector is expected to fill these requirements. Supervision of construction is not mandatory, but may be specified as a requirement by LSRCA staff.
- Projects must be constructed according to OMAF Soil Erosion Manual specifications.
- Projects must obtain approval from appropriate agencies prior to construction. In addition, any work done on municipal drains also requires prior approval from the municipality.
- All collected water must be taken to a sufficient and legal outlet.
Eligible Costs
- Professional design
- Tile outlet protection including rip rap or appropriate armour material, filter cloth, rodent guards.
- Contractors' labour and materials.
Ineligible costs
- Machinery or equipment used by the applicant, family dependents or the applicant's business
- Permits
- Taxes
For more information, please call (905) 895-1281
Please note: Applications for funding may be made to the Lake Simcoe Region Conservation Authority at any time, however, funding is limited and available on a first come first serve basis.
Thank you, in advance, for submitting your completed Application Form and Project Profile to the Lake Simcoe Region Conservation Authority.
 |